Showing posts with label sustainable design. Show all posts
Showing posts with label sustainable design. Show all posts

Wednesday, October 17, 2012

Lafarge Products Contribute to Kone Centre Green Design

The recently completed KONE Centre – featuring 125,000 square feet of office, restaurant and retail space – is a showcase for sustainability along the Mississippi River in Moline, Ill. The eight-story structure’s sustainable design includes 1,365 solar panels, light-harvesting technology, locally sourced recycled and renewable construction materials, and a host of energy-efficient building components. In addition, the shape of the building follows the solar axis and takes advantage of natural daylight.

A spectacular addition to the city’s riverfront when it officially opened in August, the multi-use facility was constructed with high-performance concrete containing Lafarge North America products: True Lite Lightweight Aggregate and a blended cement that included Class C fly ash and NewCem slag cement. These products, which are considered post-industrial recycled materials, made essential contributions to meeting the sustainable construction goals of the KONE Centre, which is expected to earn a LEED Gold rating from the U.S. Green Building Council.

The use of supplementary cementitious materials, such as fly ash and slag cement, as a partial replacement for portland cement can help designers and builders recycle industrial by-products, achieve higher performance from concrete mixtures, and earn points toward LEED certification of their projects. These blended cements have many properties that contribute to sustainable design - they produce stronger, longer-lasting concrete, reduce the consumption of nonrenewable raw materials, consume less energy, and turn by-products from other industries into resources that would otherwise be disposed of in landfills. Fly ash is derived from burning coal in electric utility plants, and slag cement is produced from granulated blast furnace slag, a by-product of the iron-making process.

Lafarge True Lite Lightweight Aggregate is also a recycled by-product of the iron production process.  About 35 percent lighter than most natural aggregates, this expanded slag product conforms to the U.S. and Canadian governments’ environmentally preferable purchasing programs and qualifies for points under many LEED credit categories. It offers excellent fire resistance, thermal insulating, and sound absorption capabilities and can help reduce heating and air-conditioning costs due to the capillary nature of the aggregate.

Tuesday, November 1, 2011

South Carolina School Uses Sustainable Design

Hanson Brick is working with Jumper Carter Sease Architects, P.A., CJMW Architecture and Lexington County School District One to create the new River Bluff High School. The school will be located near the intersection of highway 378 and I-20 on Corley Mill Road in Lexington, S.C., and is housed on a site previously owned by Guignard Brick Works. The project’s use of recycled job site materials, conceptualized by CJMW Architecture and JCS Architects, supports Lexington County School District One’s vision of a sustainable 21st Century school and provides a place for students to learn and grow.

“This project helps us build a school, while focusing on our community and keeping the environment in mind,” says Mary Beth Hill, chief communications officer for Lexington County School District One. “The use of recycled materials is cost efficient and allows us to be good stewards of our taxpayers’ dollars.”

The jobsite existed previously as an old shale pit, occupied by Guignard Brick Works. When in operation, Guignard Brick Works was the oldest continuously operating brick company in the United States. Hanson Brick was selected to provide the brick needed to complete the project, due to their ability to manufacture new bricks from existing jobsite materials at a low cost, as well as for their expertise within the industry and the overall economic benefits. Additionally, Hanson’s Columbia Brick facility is located about 12 miles from the jobsite, which also minimized transportation costs.

“Perhaps the most exciting aspect of my initial idea for using the site’s own earth to create bricks for the facility is that Hanson’s enthusiasm for the concept spawned other resource-conserving measures such as ice storage for the cooling system and the use of natural light in lieu of reliance on electrical lighting,” says Michael Kohn, principal at CJMW Architecture.

To date, Hanson has manufactured about 600,000 utility-sized “River Bluff Blend” bricks, a product design used exclusively for this project. While the majority of materials used consisted of shale from the project site, kaolin from nearby areas was required in regional manufacturing as well in order to meet the standards of the American Society for Testing and Materials.

“This project is part of our ongoing commitment to make the best use of our resources,” says Charlie Ward, senior VP and general manager of Hanson Brick. “Our ability to reuse existing site materials is not only a benefit for our customers, but for our community as well. This was truly a team effort, and credit should be shared with JCS Architects; CJMW Architecture; Southern Management Group; The Exum Co.; Mid State Masonry Contractors; and China Construction.”

River Bluff High School is currently on schedule to open during the summer of 2013.